Check for roadworks and closures
Use this service to check for current or ongoing:
- roadworks
- road closures
Using the map
Enter a postcode or zoom into an area on the map that you want to view.
The map will default to show you roadworks currently in progress. Planned works will not appear on the map until they've started.
To see roadworks planned for the future, change the selection in the dropdown menu at the top of the map.
Planned road works
You can also see our planned roadworks over the next few weeks. There will be no weekend or bank holiday working unless specified.
This list was last updated on Thursday 16 May.
Location of works | Date | Description of works to be carried out |
Frith Hill, South Heath | Monday 13 May to Tuesday 21 May | Conventional resurfacing works using a road closure in operation Monday to Friday 7:30am to 6pm |
Preston Hill, Chesham | Tuesday 21 May | Conventional remedial works using a road closure in operation 7am to 7pm. |
Buckingham Road and Perry Hill, Edgcott | Wednesday 22 May to Thursday 23 May | Conventional resurfacing works using a road closure in operation 9am to 3pm |
Radclive Road, Gawcott | Friday 24 May to Wednesday 29 May | Conventional resurfacing works using a road closure in operation 7pm to 6am |
Location of works | Date | Description of works to be carried out |
A421 Tingewick Road, Radclive | Monday 20 May to Tuesday 21 May | Plane and Patch works using a road closure in operation Monday to Friday 8pm to 6am |
Chesham Road, Amersham | Monday 20 May to Friday 24 May | Plane and Patch civils works using standard traffic management in operation Monday to Friday 9:30am to 3:30pm |
Deep Mill Lane, Little Kingshill | Monday 20 May to Thursday 23 May 2024 | Plane and Patch works using a road closure in operation Monday to Friday 7am to 7pm |
A41 Bicester Road, Aylesbury | Wednesday 22 May to Thursday 23 May | Plane and Patch remedial works using a road closure in operation Monday to Friday 8pm to 6am |
Location | Date | Works |
---|---|---|
The Parade, Bourne End | Tuesday 7 May to Tuesday 4 June | Footway Reconstruction works using a footpath closure in operation Monday to Friday 9:30am to 3:30pm |
Location of works | Date works to be carried out | Description of works to be carried out |
Berry Hill Footbridge Replacement , Near Mill Lane, Taplow | Tuesday 7 May to Friday 14 June | Footbridge Replacement Works along Mill Lane (Mill Lane Bridge Section) using a 24/7 road closure as well as localised parking restrictions. |
Marlow Suspension Bridge, High Street, Marlow | Monday 20 May to Tuesday 14 June | Bridge survey and investigation works along High Street using a road closure in operation 8pm to 6am |
Location of works | Date | Description of works to be carried out |
---|---|---|
Picasso Place, Aylesbury | Monday 13 May to Friday 7 June | Raised Table and cycleway installation using give and take traffic management in operation Monday to Friday 8am to 4:30pm |
Location of works | Date | Description of works to be carried out |
---|---|---|
Lee Clump Road/Swan Bottom Road, The Lee | Monday 20 May | Coring Investigation Works using standard traffic management in operation Monday to Friday 9:30am to 3pm |
Place Farm Way, Monks Risborough | Tuesday 21 May | Coring Investigation Works using a road closure in operation Monday to Friday 8am to 4pm |
Thorney Mill Road, Iver | Thursday 23 May to Friday 24 May | Coring Investigation Works using a road closure in operation Monday to Friday 9:30am to 3:30pm |
Location of works | Date | Description of works to be carried out |
---|---|---|
London Road, Aston Clinton | Tuesday 2 April to Tuesday 20 August | Traffic Calming works using a combination of both two-way and three-way temporary traffic lights in operation between 8am and 5pm |
Location of works | Date | Description of works to be carried out |
---|---|---|
Weedon Hill, Hyde Heath | Monday 20 May to Friday 21 June | Road safety maintenance works including widening the existing footway, installing new street lighting columns, surface water drainage, installing a puffin crossing, as well as, carriageway resurfacing and road markings. These works will be carried out using two-way temporary traffic lights as well as a 24 hour road closure which will be in operation from Tuesday 28 May to Friday 31 May and a night time closure (8pm to 6am) in operation from Monday 10 June to Sunday 16 June. |
Some activities are weather dependent and dates are subject to change at short notice.
These dates may also be subject to change depending on the availability of materials and unforeseen circumstances out of our control. We apologise in advance for any inconvenience caused.
Road worker abuse has increased this year – please respect our workforce while they make improvements to Buckinghamshire Highways
If roadwork signs have been left behind
If roadworks have finished but there is some signage that has been left behind at the site, report the location of the signs on FixMyStreet.