Check for roadworks and closures
You can view the interactive map to see all roadworks, including roadworks being done by:
- Buckinghamshire Council
- approved utility and contractual works
- emergency works
Using the interactive map
Enter a postcode or zoom into an area on the map that you want to view.
The map will default to show you roadworks currently in progress. Planned works will not appear on the map until they've started.
To see roadworks planned for the future, change the selection in the dropdown menu at the top of the map.
Our planned road works
View a list of our planned roadworks over the next few weeks below.
There will be no weekend or bank holiday working unless specified.
This list doesn't include all roadworks
This list only shows planned improvements and repairs being made by Buckinghamshire Council.
View the interactive map to see all roadworks, including utility works.
Last updated on Friday 15 November.
Location of works | Date | Description of works to be carried out |
---|---|---|
Hawkswood Lane, Gerrards Cross | Friday 15 November to Thursday 21 November | Carriageway Resurfacing works using a road closure in operation 7am to 7pm. |
Location of works | Date | Description of works to be carried out |
---|---|---|
Studham Lane, Dagnall | Monday 18 November to Friday 22 November | Plane and patch surfacing works using a road closure in operation from 8:30am to 5pm |
Roughwood Lane, Chalfont St Giles | Monday 18 November to Saturday 23 November | Plane and patch surfacing works using a road closure in operation from 8pm to 6am |
Brackley Road, Hazlemere | Monday 18 November to Wednesday 20 November | Surface patching works using a road closure in operation from 9:30am to 3:30pm |
Orchard Close, Hughenden Valley | Wednesday 20 November to Friday 22 November | Surface patching works using a road closure in operation from 9:30am to 3:30pm. |
Location of works | Date | Description of works to be carried out |
---|---|---|
High Street South Stewkley | Monday 18 November to Friday 10 January | Footway Resurfacing works using Multi-way temporary traffic lights in operation – 9:30am to 3:30pm |
Springfield Remote Footway, Padbury | Monday 18 November to Friday 22 November | Footway Resurfacing works using Multi-way temporary traffic lights in operation – 8am to 5pm |
Chiltern Court, Winslow | Monday 18 November to Friday 29 November | Footway Resurfacing works using Multi-way temporary traffic lights in operation – 8am to 5pm |
White Hart Street, High Wycombe (Monday 28th October to Thursday 10th April)
Public Realm Improvement works including Footway widening and improvements including tactile paving, Carriageway widening and improvement including kerb realignment, Drainage improvement works, Landscaping improvement works, Installation of street furniture, cycle stands and litter bins, Lighting improvement works including installation of lighting columns, and Installation of new CCTV column using a 24 hr Road closure and footway closure including weekends the works will be carried out in following phases
- Carriageway Phase A - Eden Entrance to Queens Square (Kerb Works & Carriageway works) Mon 28/10/24 Sat 14/12/24
- 24 hr Road Closure from 7am 02/12/2024 to 11:59pm 09/12/2024
- Carriageway Phase B - Travelodge to Queens Square (Carriageway works ) Mon 10/03/25 Mon 17/03/25
- 24 hr Road Closure from 7am 10/03/2025 to 11:59pm 17/03/2025
- Carriageway Phase C- Church Street to Queens Square (Carriageway works ) Mon 24/03/25 Mon 10/04/25
- 24 hr Road Closure from 7am 24/03/2025 to 11:59pm 31/03/2025
- Footway Phase A - Eden Entrance to Church Street (footway paving works) Mon 06/01/25 to Sun 26/01/25
- Footway Phase B – White Hart Street to Bull Lane (footway paving works) Mon 27/01/25 to Sat 15/02/25
- Footway Phase C – Queen Square to Bull Lane (footway paving works) Mon 10/02/25 to Fri 28/02/25
Castlefields, High Wycombe (Monday 29 July to Friday 6 December)
Traffic Calming works using a Road Closure in operation Monday to Friday from 7:30am to 5:30pm and Saturday 8am to 4pm.
The works will be carried out in the follow phases:
- Spearing Road 24/09/2024 to 18/10/2024 (Cross Road to Rutland Avenue)
- Spearing Road 07/10/2024 to 11/10/2024 (not including Wednesday 9th October) (Spearing Road Junction with Cross Road)
- Rutland Avenue 09/10/2024 (Rutland Avenue to Spearing Road)
- Rutland Avenue 12/10/2024 (Whole of Rutland Avenue)
- Spearing Road 13/10/24 to 04/11/24 (Cross Road to Spearing Road junction)
- Spearing Road 05/11/2024 to 12/11/2024 (Cross Road to Rutland Avenue)
- Cross Road 11/11/2024 to 30/11/24 (Cross Road to Rutland Avenue)
- Spearing Road 14/11/2024 to 16/11/2024 (The Middleway to Rowliff Road)
- Spearing Road 18/11/2024 to 19/1/11/202 (Rutland Avenue to Rowliff Road)
- Whitelands Road 20/11/2024 to 22/11/2024 (Whole length)
- Rutland Avenue 27/11/2024 to 29/11/2024 (Cross Road to Rutland Avenue junction)
- Rutland Avenue 02/12/2024 to 06/12/2024 (Chairborough Road to The Middleway)
London Road, Aston Clinton (Tuesday 29 October to Tuesday 5 November)
Traffic Calming works using multi-way temporary traffic lights:
- from Tuesday 29 October to Friday 1 November, in operation between 7am to 7pm
- from Monday 4 November to Tuesday 5 November in operation between 9:30am to 3:30pm
White Hart Street, High Wycombe (Monday 28 October to Thursday 10 April)
Public Realm Improvement works including Footway widening and improvements including tactile paving, Carriageway widening and improvement including kerb realignment, Drainage improvement works,
Landscaping improvement works, Installation of street furniture, cycle stands and litter bins, Lighting improvement works including installation of lighting columns, and Installation of new CCTV column using a
24 hr Road closure and footway closure including weekends the works will be carried out in following phases
- Carriageway Phase A - Eden Entrance to Queens Square (Kerb Works & Carriageway works) Monday 28 October to Saturday 14 December
- 24 hour Road Closure from 7am 2 December 2024 to 11:59pm 9 December 2024
- Carriageway Phase B - Travelodge to Queens Square (Carriageway works) Monday 10 March 2025 to Monday 17 March 2025
- 24 hour Road Closure from 7am 10 March 2025 to 11:59pm 17 March 2025
- Carriageway Phase C- Church Street to Queens Square (Carriageway works ) Monday 24 March 2025 to Monday 10 April 2025
- 24 hour Road Closure from 7am 24 March 2025 to 11:59pm 31 March 2025
- Paving Phase A - Eden Entrance to Church Street (footway paving works) Monday 6 January 2025 to Sunday 26 January 2025
- Paving Phase B – White Hart Street to Bull Lane (footway paving works) Monday 27 January 2025 to Saturday 15 February 2025
- Paving Phase C – Queen Square to Bull Lane (footway paving works) Monday 10 February 2025 to Friday 28 February 2025
Location of works | Date | Description of works to be carried out |
---|---|---|
Perry Lane, Bledlow | Monday 18 November to Wednesday 20 November | Coring Investigation Works using stop & go traffic management in operation between 8am to 6pm |
Abbey Barn Road, High Wycombe | Tuesday 19 November to Thursday 21 November | Coring Investigation Works using a combination of temporary traffic signals and stop & go traffic management in operation between 8am to 6pm |
Dropmore Road, Burnham | Wednesday 20 November to Friday 22 November | Coring Investigation Works using stop & go traffic management in operation between 8am to 6pm |
St Johns Road / Kingswood Road, Tylers Green | Wednesday 20 November to Friday 22 November | Coring Investigation Works using stop & go traffic management in operation between 8am to 6pm |
Beaufort Close / Gardens, Marlow | Thursday 21 November | Coring Investigation Works using stop & go traffic management in operation between 8am to 6pm |
Riverpark Drive, Marlow (Thursday 21st November) | Thursday 21 November | Coring Investigation Works using stop & go traffic management in operation between 8am to 6pm. |
Harwood Road, Marlow | Thursday 21 November | Coring Investigation Works using stop & go traffic management in operation between 8am to 6pm |
Chapel Hill, Speen | Thursday 21 November to Friday 22 November | Coring Investigation Works using stop & go traffic management in operation between 9:30am to 3:30pm. |
Memorial Road, Hampden Row | Friday 22 November | Coring Investigation Works using road closure traffic management in operation between 8am to 6pm |
Lane End Road, High Wycombe | Monday 18 November to Tuesday 19 November | Coring Investigation Works using road closure traffic management in operation between 8am to 6pm |
Location of works | Date | Description of works to be carried out |
---|---|---|
Hawkswood Lane, Gerrards Cross | Monday 18 November to Thursday 21 November | Failed Road Reconstruction works using a road closure in operation 7am to 7pm |
Location of works | Date | Description of works to be carried out |
---|---|---|
High Street & Deanway, Chalfont St Giles | Monday 4 November to Monday 18 November | Upgrade of 2 existing zebra crossings to raised table zebra crossing using a road closure in operation 9:30am to 2:30pm. |
B4009 Tring Hill, Aston Clinton | Wednesday 20 November to Friday 22 November | Road safety fence works using two-way temporary traffic lights in operation between 9:30am to 3:30pm. |
Location of works | Date | Description of works |
---|---|---|
Vale Park Drive, Aylesbury | Monday 18 to Friday 3 December | Refurbishment of traffic signal equipment to pelican crossing, using a lane closure from 9:30am to 4pm. |
Location of works | Date | Description of works to be carried out |
---|---|---|
Amersham, Aston Clinton, Aylesbury, Beaconsfield, Buckingham, Chesham, Dagnall, Denham, Farnham Royal, Flackwell Heath, George Green, Gerrards Cross, Great Kimble, Haddenham, Hazlemere, High Wycombe, Iver, Little Chalfont, Loudwater, Marlow, Marsworth, Radclive, Rowsham, Stewkley, Stokenchurch, Tingewick, Weston Turville, Wexham, Whaddon, Winslow | Monday 21 October to Friday 29 November |
Countywide stump replacements (removal of old stumps and installation of new lighting columns) Traffic management will vary in each location. |
Location of works | Date | Description of works to be carried out |
---|---|---|
North Farm Lane, Grendon Underwood | Monday 18 November to Friday 6 December | Drainage works to alleviate issues with carriageway flooding using a road closure in operation 24/7. Our working hours are 8am to 5pm |
Location of works | Date | Description of works to be carried out |
---|---|---|
B488 Upper Icknield Way & Tring Road | Monday 18 November | Capital Lining Works using a road closure in operation between 8pm to 6am. |
Missenden Road, Ellesborough | Monday 18 November to Tuesday 19 November | Capital Lining Works using a road closure in operation between 8pm to 6am. |
Due to building works in the town centre, a limited number of car parking spaces in the Exchange Car Park and Waterside North Car Parks are currently unavailable.
There still remains ample space in both locations to park and if they are busy, alternative parking is available close by in the Upper Hundreds and Walton Street car parks.
Overnight road closures on A413, London Road, Wendover (Small Dean) in November. Road will be closed for a total of 7 nights in November for construction of the final pier in preparation of the Small Dean viaduct launch in early 2025.
Overnight road closures are planned for the following dates between the hours of 8:30pm – 5:30am:
- Tuesday 19 November to Thursday 21 November
A418 Aylesbury Road, Bierton (current to 29 November)
Traffic Calming scheme using 24 hour two-way traffic signals.
For more information and contact details visit the Bierton Traffic Calming website.
Some activities are weather dependent and dates are subject to change at short notice.
These dates may also be subject to change depending on the availability of materials and unforeseen circumstances out of our control. We apologise in advance for any inconvenience caused.
Road worker abuse has increased this year – please respect our workforce while they make improvements to Buckinghamshire Highways
If roadwork signs have been left behind
If roadworks have finished but there is some signage that has been left behind at the site, report the location of the signs on FixMyStreet.